On tear-off day the crew removes the old roof, inspects and repairs the deck, installs the new system and cleans up daily. Your part is small: clear the area, move cars and know who to talk to. Here is the day in order, plus what to watch for. It is part of every roof replacement from Dalton Roofing.

A tear-off is the loudest and messiest part of a new roof. Knowing the steps ahead of time makes the day easier on you, your family and your neighbors in Fort Pierce, Port St. Lucie or anywhere else we work.

What happens first on tear-off day?

The crew arrives, protects what needs protecting and starts removing the old roof. Ask your project contact when they plan to arrive and who is in charge on site that day.

Here is the usual order of the day:

  1. The crew walks the site and talks through the plan with you.
  2. Landscaping, patio furniture and anything near the walls gets covered or moved.
  3. The old roofing material comes off in sections.
  4. Debris is collected as the work moves along.
  5. The bare deck is inspected for damage.
  6. Any bad deck is repaired before new material goes on.
  7. The new roof system is installed.
  8. The site is cleaned before the crew leaves.

The order can shift with weather and roof size. A good crew tells you when the plan changes and why.

What should you do before the crew arrives?

Clear the driveway, move cars away from the house and bring in anything fragile. Vibration from tear-off can shake items off walls and shelves, so take down mirrors and framed pictures on top-floor walls.

  • Park vehicles away from the work zone.
  • Move patio furniture, grills and planters from around the house.
  • Take down wall items under the roof.
  • Tell the crew where pets will be, or keep them inside a quiet room or away from the house.
  • Make sure the crew can reach a gate or side yard.

If you have a pool, ask how the crew plans to keep shingles, nails and dust out of the water. Raise this before the day, not after.

What is checked on the deck?

Once the old roof is off, the crew looks at the bare deck for rot, soft spots, water stains and loose or damaged sections. Dalton's process includes inspecting and repairing the deck before the new system is installed.

This is the moment you learn what was under the old roof. Ask the crew to show you, or send photos, of any bad spots they find. Ask what they plan to repair and how the written scope covers deck work.

Deck repair can change the plan, so ask about it early. Our estimates are written and itemized after an inspection, which is a good place to see how deck repairs are handled.

What happens to debris?

Old shingles, tile pieces, nails and underlayment have to go somewhere, and the plan should be clear before the first piece comes off. Ask how debris is collected, where it is staged and when it leaves.

On a tear-off, debris falls fast. Crews usually protect the ground and landscaping and gather material as they go, not all at once at the end. Ask about nails in particular, since a stray nail in a driveway can flatten a tire.

If you live in an HOA community, the rules on dumpsters and driveway use may apply. Our guide to HOA approval for a roof replacement covers what to check.

What should you watch for?

Watch for open sections of roof at day's end, missing cover on landscaping and a crew that does not explain deck findings. These are signs to ask questions, not signs to panic.

  • A roof left open with no plan for rain.
  • Debris piling up in the yard with no one gathering it.
  • No one on site who can answer questions.
  • Deck problems found but not shown or explained.
  • Changes to the plan that are not put in writing.

Florida weather moves fast, especially in summer. Ask what the crew does if rain rolls in mid-job. Dalton also provides 24/7 storm and emergency response, so you have someone to call if weather turns.

What does daily cleanup mean?

For Dalton, daily cleanup means the crew cleans up daily instead of leaving the mess for the end of the job. Expect the yard, driveway and walkways to be tidied at the end of each work day.

Walk the property with the crew lead at day's end if you can. Look at the driveway, the flower beds and the roof line. If something was missed, say so that evening, while the crew is still on the job.

A messy site is a safety issue, not just a looks issue. Kids and pets can find nails and loose material fast.

Is a roof replacement the right call?

If you are still unsure whether you need a new roof or a repair, read our post on roof repair versus replacement before you book a tear-off.

Dalton offers a free roof inspection with a written summary and no obligation. That inspection is the best place to ask every question in this post. We speak English and Spanish (Se habla espanol), so you can ask in the language you prefer.

To set up a free roof inspection, call Dalton Roofing at (561) 662-6622. We will walk you through the steps, the deck check and the cleanup before tear-off day.

Frequently Asked Questions

How long does a roof tear-off take?

It depends on roof size, type and weather. Ask the crew for the plan for your roof before the work starts, and ask them to tell you if the schedule changes.

Do I need to be home on tear-off day?

Not always, but it helps to be reachable. Make sure the crew lead has your phone number so they can ask questions if they find deck damage or need a decision.

Is tear-off noisy?

Yes. Expect loud work, vibration and activity around the house. Plan for pets and anyone who works from home, and take down wall items under the roof.

Can I ask to see the deck before the new roof goes on?

Yes. Ask the crew to show you or send photos of any damaged areas and explain what they plan to repair. A clear explanation is a good sign.